Why these sites are different
- Quarries: benches, irregular floors, standing water, slope stability, restoration plans.
- Landfills: the capping must not be pierced; ballasted or lightweight foundations, settlement, biogas and water management.
- Brownfield land: possible remediation, buried services, demolition, zoning constraints.
What the EPC must do
- Structural and geotechnical design for the site, not adapted from a standard plant.
- Managing interfaces with environmental obligations.
- Earthworks and water management.
- Coordination with the competent authorities.
Exclusions weigh more than usual here: we check them with you before the tender. Early-stage? Involving the EPC during development helps design a buildable layout.
Send us your plant details
A few details are enough to understand which EPCs make sense for your case. We call you back; if you prefer, write to us on WhatsApp or call toll-free 800 955358 from Italy.
Frequently asked questions
Are former quarries suitable areas for solar in Italy?
Italian rules on suitable areas include, among others, closed quarries and mines and closed landfills, under conditions to be checked case by case, including regional rules.