The roof comes first
On industrial roofs the first issue is not solar, it is the roof: structural capacity, sheet condition, waterproofing, fall protection and, on older buildings, asbestos removal. A serious EPC checks these before pricing and states whether removal and re-roofing are included.
What the EPC must guarantee
Own roof or third-party investor
If the company prefers not to invest, an investor can build the plant and sell the power through a long-term agreement, or lease the roof. Either way an EPC is needed, and we can involve it on the investor's behalf. For multi-site groups see C&I portfolios.
Send us your plant details
A few details are enough to understand which EPCs make sense for your case. We call you back; if you prefer, write to us on WhatsApp or call toll-free 800 955358 from Italy.
Frequently asked questions
My roof has asbestos: is solar possible?
Yes, but removal and re-roofing must be planned and priced. It is one of the first points to clarify with the EPC.