FER X and MACSE in brief
FER X is Italy's support scheme for mature renewables, including solar, based on contracts for difference awarded by GSE, through competitive procedures for larger plants. MACSE is the mechanism through which Terna procures long-term electricity storage capacity via dedicated auctions. In both, contracts set deadlines for construction and commercial operation, with consequences if missed. Detailed rules change with each round and must be read in the official GSE and Terna documents.
Why the EPC choice becomes critical
- Site capacity: when many awarded plants start together, crews and equipment saturate.
- Supply: transformers, HV equipment and battery systems can have long lead times.
- Guarantees: EPC delay damages and bonds must match what you committed to GSE or Terna.
- Grid: grid works must be under control from day one.
See BESS EPC, utility-scale EPC and the EPC contract guide.
Send us your plant details
A few details are enough to understand which EPCs make sense for your case. We call you back; if you prefer, write to us on WhatsApp or call toll-free 800 955358 from Italy.
Frequently asked questions
Do you help with auction participation?
No, our role starts when there is a plant to build. Bidding requires dedicated advisors.
How early should I look for the EPC?
As early as possible, ideally before the award: real construction costs and timelines make the bid stronger too.