Stand-alone, hybrid or behind the meter
Stand-alone
Grid-connected storage, often HV, earning on energy and ancillary markets or capacity contracts such as MACSE.
Hybrid PV + BESS
Storage co-located with a solar or agrivoltaic plant.
Behind the meter
Storage for a company, paired with rooftop solar.
What a BESS EPC must master
- Integration of batteries, PCS, transformers, EMS and controls, with one party owning the interfaces.
- Fire safety: distances, detection and suppression, thermal management, consistent with the permit and fire brigade prescriptions.
- Civil works: foundations, platforms, roads, drainage.
- Grid connection: user substation, cables, coordination with the grid operator.
- Testing: capacity, efficiency and availability tests with clear guarantees and degradation curves.
Questions to ask in the tender
- Is the battery supplier named? Who guarantees capacity and degradation?
- Is the battery system supply split from civil and electrical BOP?
- Who is liable for integration between vendors?
- Are long-term service and extended warranties offered? See EPC + O&M.
- Do HV equipment lead times fit the COD?
Storage projects are concentrated in Sicily, Sardinia, Puglia, Basilicata and Lazio.
Send us your plant details
A few details are enough to understand which EPCs make sense for your case. We call you back; if you prefer, write to us on WhatsApp or call toll-free 800 955358 from Italy.
Frequently asked questions
Single EPC or split supply and BOP?
Both are common. A single EPC simplifies liability; a split can save cost but requires careful interface management. We assess it with you.
Do you cover MACSE-awarded projects?
Yes. See FER X and MACSE: delivery date is the key constraint.