Ready to build (RTB) solar projects in Italy: find the EPC that builds yours

You own a ready to build solar project in Italy, permitted and with a defined grid connection. Now one question matters: who builds it, how fast and with which guarantees. We connect you with EPC contractors selected by size, technology and region, and help you obtain comparable offers.

What ready to build means

Ready to build (RTB) is the status of a solar, agrivoltaic or BESS project that has completed development and can start construction. In Italy an RTB project typically has:

  • an effective permit (Autorizzazione Unica, PAS or simplified procedure, depending on size and regime);
  • an accepted grid connection solution with the grid operator (STMG or connection offer) and a clear path to grid works;
  • site rights: surface rights, ownership or lease on land or roof for the plant's lifetime;
  • a design detailed enough for an EPC to make a serious offer, with authority prescriptions known.

The next milestone is COD (commercial operation date). Between RTB and COD sits the whole EPC scope.

Why the EPC is central at RTB stage

An RTB project has removed most development risk. What remains is execution risk: lead times for modules, inverters and transformers, site management, grid works, prescriptions, testing. Investors and lenders assess the EPC as closely as the permit. A cheaper offer that excludes grid works or lacks performance guarantees can cost far more than it saves. See the solar EPC contract guide.

How we help you build your RTB project

  1. RTB status check – we verify with you that permit, grid and site rights are truly tender-ready, and what is missing if not.
  2. EPC selection – a few EPCs consistent with size, technology and region, with site capacity in your timeframe.
  3. Comparable request for proposal – same scope (grid works included or excluded), same assumptions, same required guarantees. See EPC tender.
  4. Choice and contract – you decide and sign directly with the EPC; we can support you through EPC selection advisory.

Who this page is for

  • Developers who brought a project to RTB and want to build it with an EPC in place.
  • Investors, funds and IPPs who acquired RTB projects in Italy: see EPC for investors.
  • SPV owners with an awarded tariff or auction and a COD to meet: see FER X and MACSE.

Send us your plant details

A few details are enough to understand which EPCs make sense for your case. We call you back; if you prefer, write to us on WhatsApp or call toll-free 800 955358 from Italy.

Information stays confidential: no project data is shared with any EPC without your consent.

Frequently asked questions

What does RTB mean in solar?

Ready to build: the project has an effective permit, an accepted grid connection and site rights, so it can move to construction.

RTB vs COD?

RTB is when the project can open the construction site; COD is when the plant starts commercial operation. The EPC delivers what lies in between.

Do investors require an EPC in place?

Very often, yes: at RTB stage the EPC is part of the risk profile. Comparable EPC offers make the project easier to finance.

Do you buy or sell RTB projects?

No. We focus on construction: we connect those who need to build with suitable EPCs.